Hose/Applicator Expansion Base
G-4
Power Requirements
Removing the Melter from the Sub-Base
Part 1128350_02
If the melter's electrical service wiring is already sized to support
6 hoses/applicators, then no changes are required when installing the
hose/applicator expansion base. For information about sizing the melter
electrical service, refer to Configure the Electrical Service given earlier
manual in Installation (Section 1).
To install the expansion base on the melter, you must first remove the
sub-base from the melter.
1. Disconnect supply power to the melter.
2. Disconnect melter hoses and air supply line.
3. (Optional) If the input power cable was routed into the melter through the
knockout in the sub-base, disconnect the power cable from TB1 on the
main board, and then remove the cable from the sub-base.
4. See Figure G-3. Use a 6 mm hex wrench to remove the two M8
socket-head cap screws on the front of the chassis. Retain the screws.
Figure G-3
Remove melter from the sub-base
E 2020 Nordson Corporation