ProBlue Flex 400/480 Volt Transformer
F-6
Clearances
Figure F-1
Clearances around the melter and transformer
Part 1128350_02
Figures F-1, F-2, and F-3 show the recommended clearances around the
melter installed on the transformer. Referring to the following figures will
assure the setting of the minimum clearances that are required between the
melter and:
-
Hoses
-
Cordsets
-
Power cabling
-
Tank lid
-
E-Box door
-
Air supply
-
Pump
Transformer height
3.3 in. (83 mm)
E 2020 Nordson Corporation