Mounting The Expansion Base To The Sub-Base - Nordson ProBlue Flex Product Manual

Adhesive melter with bbconn controls
Hide thumbs Also See for ProBlue Flex:
Table of Contents

Advertisement

Mounting the Expansion Base to the Sub-Base

E 2020 Nordson Corporation
CAUTION! Ensure that the sub-base ground lead is properly routed and is
not pinched between the sub-base and the expansion base.
1. Route the sub-base ground lead through the pass-through in the
expansion base.
2. Carefully lower the expansion base onto the sub-base.
3. Slide the expansion base forward so that the sub-base locking tabs
securely connect with the expansion base.
4. Secure the expansion base to the sub-base using the two M8 x 20
socket-head screws provided in the installation kit. Use a 6mm hex
wrench to tighten the screws.
NOTE: Torque the M8 socket-head cap screws to 17 ft-lb (23 Nm).
Step 2
Step 3
Figure G-5
Mounting the expansion base to the sub-base
Hose/Applicator Expansion Base
G-7
Part 1128350_02

Advertisement

Table of Contents
loading

Table of Contents