4. Set the pump air pressure to 1.37 bar (20 psi) and press
the OLED user interface to enable the pump.
5. Using a flat tip screwdriver, slowly turn the drain valve tip
counterclockwise until a steady stream of material flows. Continue
pumping material until the tank is empty.
6. Press
on the OLED user interface to disable the pump.
7. Close the drain valve by turning the drain valve tip clockwise until it stops.
8. Wipe off the drain chute and raise it.
9. Install the front panel and secure it by tightening the four latches.
Maintenance
5-7