Nordson ProBlue Flex Product Manual page 62

Adhesive melter with bbconn controls
Hide thumbs Also See for ProBlue Flex:
Table of Contents

Advertisement

Installation
3-22
Connecting Power Cables
Part 1128350_02
(contd)
WARNING! Risk of electrical shock. Steps 4 - 6 must be completed before
using the melter.
4. Connect the ground lead (external protective grounding conductor) from
the power cable to the ground lug that is located on the chassis. The lug
is marked PE/G.
5. Insert the correct voltage plug into receptacle X10 on the power
distribution PCA board. Ensure that the plug snaps into place.
If the plug contains a neutral lead, connect the neutral lead to receptacle
X9 and X11 on the power distribution PCA board.
6. Plug the electrical connector into receptacle TB1 on the power
distribution PCA board.
7. When the electrical service is completely installed and inspected in
accordance with local electrical codes and standards, close the E-Box
door and reinstall the E-Box enclosure side panel. Switch on the local
power disconnect switch.
E 2020 Nordson Corporation

Advertisement

Table of Contents
loading

Table of Contents