Mounting The Melter - Nordson ProBlue Flex Product Manual

Adhesive melter with bbconn controls
Hide thumbs Also See for ProBlue Flex:
Table of Contents

Advertisement

Mounting the Melter

E 2020 Nordson Corporation
1. Mark the sub-base bolt pattern on the parent machine or support
structure and then drill holes for four 8 mm (
(customer-supplied).
NOTE: The mounting sub-base has the same bolt-mounting pattern as
®
Nordson's ProBlue
melters.
2. Bolt the sub-base to the parent machine using four 8-mm (
machine bolts with locking hardware. See figure on the left.
NOTE: If you want to route the incoming power line from underneath the
melter and through the sub-base, refer to Connecting Incoming Power
given in the following page.
3. Carefully lower the melter onto the sub-base.
4. Slide the melter forward so that the sub-base locking tabs securely
connect with the melter.
5. Lock the melter to the sub-base by reattaching the two M8 socket head
cap screws located on the front of the chassis using an M6 hex wrench.
NOTE: Torque the M8 socket head cap screws to 17 ft-lb (23 Nm).
6. Connect the ground wire from the ground wire connection on the
sub-base plate into the ground wire connection on the chassis. Reinstall
the cover plate and fasten the screw.
Installation
3-15
5
/
in.) mounting bolts
16
5
/
in.)
16
Part 1128350_02

Advertisement

Table of Contents
loading

Table of Contents

Save PDF