Installation; Installation Tasks - Nordson ProBlue Flex Product Manual

Adhesive melter with bbconn controls
Hide thumbs Also See for ProBlue Flex:
Table of Contents

Advertisement

Installation

Installation Tasks

E 2020 Nordson Corporation
WARNING! Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
Before starting the installation, locate the ship-with kit and inspect for
damaged and missing parts. Report any problems to your Nordson
representative.
The installation sequence is as follows:
1. Verify that the desired installation location provides the required
clearance, environmental conditions, and utilities.
2. Remove the transformer from the shipping container and inspect.
NOTE: Retain the two side spacers from the transformer shipping
container. These are used while installing the ProBlue Flex melter on the
transformer. See figure on the left (spacers highlighted in grey).
3. Verify that the transformer is correctly sized for the number and type of
hoses/applicators you intend to use.
4. Mount the transformer onto the parent machine or support structure.
5. Mount the melter onto the transformer.
6. Configure the electrical service.
ProBlue Flex 400/480 Volt Transformer
F-3
Part 1128350_02

Advertisement

Table of Contents
loading

Table of Contents