Installation
3-12
Removing the Melter from the Sub-base
Part 1128350_02
2. Open the E-Box enclosure door and remove the enclosure side panel to
access the chassis cover plate and chassis to sub-base ground wire.
Figure 3-7
Opening the E-Box door and removing the side panel
(contd)
E 2020 Nordson Corporation