Nortel Meridian 1 Replacement Manual page 82

Hardware replacement
Table of Contents

Advertisement

Page 82 of 362
Replacing equipment
553-3001-520 Standard 16.00 April 2000
6
Installing the replacement IOP/CMDU into the IOP/CMDU slot:
a
Set the ENB/DIS switch on the replacement IOP/CMDU to DIS.
b
Install the IOP/CMDU into slots 17, 18, and 19 in the NT5D21
Core/Network Module or slots 16, 17, and 18 in the NT9D11
Core/Network Module and NT6D60 Core Module. Lock the locking
devices by pushing them gently towards the faceplate.
c
Set the ENB/DIS switch to ENB and observe the card LED during
self-test. The LED should flash three times and stay lit until the card
is software enabled.
7
Enable the IOP/CMDU and test its operation:
LD 137
ENL IOP
STAT IOP
****
8
Perform equipment data dumb again if the previous attempt (in step 2)
was not successful. With the replacement IOP/CMDU, successful data
dump should be obtained:
LD 43
EDD
****
9
The following procedure will disrupt the call processing. To update the
software and the ROM on the replacement IOP/CMDU to the software
currently residing on the IOP/CMDU hard disk, perform the following
steps:
to load the program
to enable the IOP part of the IOP/CMDU
to check the status of the IOP part of the
IOP/CMDU
exit LD 137
load LD 43
execute datadump and wait until
"DATADUMP COMPLETE" and
"DATABASE BACKUP COMPLETE" are
displayed before exiting the program.
exit LD 43