Nortel Meridian 1 Replacement Manual page 179

Hardware replacement
Table of Contents

Advertisement

5
Tag and disconnect cables to the paddle board you are removing
(connector J1 for port 1, connector J2 for port 2).
6
Pull the paddle board out of the connector on the backplane.
Installing equipment
1
Set the ENB/DIS switch to the disable position (down) on the
replacement paddle board.
2
Set option switches on the replacement paddle board the same as on the
board you removed. If there is a vintage change, be sure to check Circuit
Card: Installation and Testing (553-3001-211) for any differences.
3
Plug the replacement paddle board into the vacated connector on the
backplane.
4
Connect cables to the replacement paddle board.
5
Set the ENB/DIS switch to the enable position (up) on the replacement
paddle board.
6
Replace the I/O safety panel. Replace the rear cover on the module.
7
Software enable and test each port on the paddle board:
ENL TTY x
TTY x
— If there is a problem, an IOD system message is generated and the
red LED lights on the faceplate of the card.
— If there is no problem, exit LD 37:
****
8
Tag defective equipment with a description of the problem and package
it for return to a repair center.
Replacing equipment
Hardware replacement
Page 179 of 362

Advertisement

Table of Contents
loading

Table of Contents