Nortel Meridian 1 Replacement Manual page 160

Hardware replacement
Table of Contents

Advertisement

Page 160 of 362
553-3001-520 Standard 16.00 April 2000
Replacing equipment
10 One at a time starting with the breaker for the blower unit, set the circuit
breakers on the PDU to ON (up). Make sure the green LED lights on the
power supply unit(s) in each module.
Note: On initial power up the blower may rotate slower than expected.
As the sensor detects heat, the blower will rotate more rapidly.
11 Replace the pedestal grills in the front and rear.
12 Tag defective equipment with a description of the problem and package
it for return to a repair center.

Advertisement

Table of Contents
loading

Table of Contents