Nt8D3703 Ipe Module Card Cage - Nortel Meridian 1 Replacement Manual

Hardware replacement
Table of Contents

Advertisement

NT8D3703 IPE Module Card Cage

To replace a defective backplane in an NT8D37 IPE Module, you must
replace the card cage. Use this procedure to replace the IPE Module card
cage.
See the X11 Administration (553-3001-311) for a description of all
maintenance commands, and the X11 System Messages Guide
(553-3001-411) for interpreting system messages.
Module covers are not hinged; do not let go of the cover. Lift the cover
away from the module and set it out of your work area.
Removing equipment
1
Software disable the controller card (and all cards connected to the
controller):
LD 32
DSXP x
2
Turn off power to the column or the module power supply and ringing
generator (if equipped):
— With AC power, set the main circuit breaker for the column to OFF
(down) in the rear of the pedestal.
Due to hazardous voltage in AC-powered systems, power to the entire
column must be shut down. This shuts down all functions in the
column.
— With DC power, set the switch on the NT6D40 PE Power Supply
and NT6D42 Ringing Generator to OFF (down). Set the circuit
breaker for just this module to OFF (down) in the rear of the
pedestal. (All other modules in the column retain power.)
Replacing equipment
WARNING
"x" is the controller card number
WARNING
Page 215 of 362
Hardware replacement

Advertisement

Table of Contents
loading

Table of Contents