Nortel Meridian 1 Replacement Manual page 72

Hardware replacement
Table of Contents

Advertisement

Page 72 of 362
Replacing equipment
553-3001-520 Standard 16.00 April 2000
5
Installing the replacement IOP/CMDU into the IOP/CMDU slot:
a
Set the ENB/DIS switch on the replacement IOP/CMDU to DIS.
b
Install the IOP/CMDU into its vacant card slot and lock the locking
devices by pushing them gently towards the faceplate.
c
Set the ENB/DIS switch to ENB and observe the card LED during
self-test. The LED should flash three times and stay lit until the card
is software enabled.
6
Enable the IOP/CMDU and test its operation:
LD 137
ENL IOP
STAT IOP
****
7
Perform equipment data dumb again if the previous attempt (in step 2)
was not successful. With the replacement IOP/CMDU, successful data
dump should be obtained:
LD 43
EDD
****
8
The following procedure will disrupt the call processing. To update the
ROM on the replacement IOP/CMDU to the software currently residing
on the IOP/CMDU hard disk, perform the following steps:
to load the program
to enable the IOP part of the IOP/CMDU
to check the status of the IOP part of the
IOP/CMDU
exit LD 137
load LD 43
execute datadump and wait until
"DATADUMP COMPLETE" and
"DATABASE BACKUP COMPLETE" are
displayed before exiting the program.
exit LD 43

Advertisement

Table of Contents
loading

Table of Contents