Nortel Meridian 1 Replacement Manual page 126

Hardware replacement
Table of Contents

Advertisement

Page 126 of 362
553-3001-520 Standard 16.00 April 2000
Replacing equipment
TEST CNI c s
****
17 Set the ENB/DIS switch to ENB on the clock controller card.
18 Set the ENB/DIS switch to ENB on all CNI cards.
19 Press and release the MAN RST button on the CP card in the new card
cage. When SYS700 messages appear on the LCD display, set the
NORM/MAINT switch to NORM. Within 60 seconds, the LCD will
display the following messages, confirming the process:
RUNNING ROM OS
ENTERING CPU VOTE
By the active CPU, an HWI533 message from the CPSI or SDI port
indicates the memory is shadowed.
Note 1: At this point, the other Core is still active and in split mode. The
Core in the new card cage is the standby (inactive) side. The memories
are shadowed (synchronized), but the hard disks are not synchronized
(redundancy is disabled).
Note 2: A CNI port LED may not go out if a network loop
corresponding to that port is disabled.
20 Set the NORM/MAINT switch to NORM on the CP card in the active
Core and perform a redundancy sanity test:
LD 135
STAT CNI
STAT CPU
TEST CPU
TEST CNI c s
Note: Testing the CP and CNI cards can take 2 minutes or more for each
test.
21 Switch Cores and test the other side:
SCPU
TEST CPU
test each configured CNI on the inactive side
exit LD 135
get the status of all configured CNIs
get the status of both Cores
test the inactive CP card and CP to CP cable
test each configured CNI on the inactive side
switch to Core 0
test the inactive CP card and CP to CP cable

Advertisement

Table of Contents
loading

Table of Contents