Epson RC700 Manual page 150

Robot controller fieldbus i/o
Hide thumbs Also See for RC700:
Table of Contents

Advertisement

2. Installation
2.
Wiring
The CC-Link connector is a 5-pin open connector. Use the connector attached to the
board for wiring.
Terminal name for each pin
Terminal No
Connect the CC-Link master module and the CC-Link slave board as follows.
Master Station
DA
Terminating
Resistor
DB
DG
SLD
FG
Prepare the cable for CC-Link Ver.1.10 sold in the market as a communication cable.
NOTE
Install terminating resistors at both ends of the network.
Use the terminating resistors attached to the CC-Link master station.
Make sure to disconnect the connectors only after turning OFF the power supply of the
specific station.
Connect the shield wire for CC-Link to the "SLD" of each unit and ground the both ends
via "FG".
140
Set the CC-Link baud rate. Check the master configuration and set the same baud
rate. Refer to the following table for configuration.
Baud Rate
156 k
625 k
2.5 M
5 M
10 M
Configuration prohibited
Terminal Name
1
DA
2
DB
3
DG
4
SLD
5
FG
Twisted-pair Cable
with Shield
Switch
0
1
2
3
4
5-9
Robot System
CC-Link Board
DA
DB
DG
SLD
FG
Twisted-pair Cable
with Shield
RC700 / RC90 Option Fieldbus I/O Rev.12
CC-Link
Module
DA
Terminating
Resistor
DB
DG
SLD
FG

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rc90

Table of Contents