2.5 PROFINET
Make sure that the power is turned OFF before installing/removing any boards or
connecting/disconnecting any cables.
connecting/disconnecting any cables with the power ON is extremely hazardous
WARNING
and may result in electric shock and/or malfunction of equipment.
2.5.1 PROFINET Slave Board Installation
Appearance
The Fieldbus slave board is configured as follows at shipment.
Board Appearance
CN3
JMP1
DSW1
DSW2
RC700 / RC90 Option Fieldbus I/O Rev.12
RJ45 Connector
Status Display LED
Configuration
CN3
All Open
Installing/removing any boards or
LNK/ACT LED : Link status /
MS LED
CS LED
DSW2
DSW1
SW1
SW2
SW3
SW4
All ON
Fixed as above
2. Installation
Communication packet
reception or transmission
status display
: Module status display
: IO Controller connection
status display
JMP1
SW1
IRQ5
JP1
SW2
IRQ7
JP2
SW3
IRQ10
JP3
SW4
IRQ11
JP4
SW5
IRQ15
JP5
SW6
SW7
1 2
SW8
All Open
159