Initial Commissioning - Danfoss VLT AutomationDrive FC 301 Programming Manual

Hide thumbs Also See for VLT AutomationDrive FC 301:
Table of Contents

Advertisement

How to Program

2.1.7 Initial Commissioning

2
2
The easiest way of carrying out the initial commissioning is by pressing [Quick Menu] and following the quick set-up
procedure using LCP 102 (read Table 2.3 from left to right). The example applies to open-loop applications.
Press
Quick
Menu
Parameter 0-01 LanguageParameter 0-
01 Language
Parameter 1-20 Motor Power [kW]
Parameter 1-22 Motor Voltage
Parameter 1-23 Motor Frequency
Parameter 1-24 Motor Current
Parameter 1-25 Motor Nominal Speed
Parameter 5-12 Terminal 27 Digital
Input
Parameter 1-29 Automatic Motor
Adaptation (AMA)
Parameter 3-02 Minimum/Offset
Reference
Parameter 3-03 Maximum Reference
Parameter 3-41 Ramp 1 Ramp Up Time
Parameter 3-42 Ramp 1 Ramp Down
Time
Parameter 3-13 Reference Site
Table 2.3 Quick Set-up Procedure
22
®
VLT
AutomationDrive FC 301/302
Q2 Quick Menu
OK
Set language
OK
Set motor nameplate power
OK
Set nameplate voltage
Set nameplate frequency
OK
Set nameplate current
OK
Set nameplate speed in RPM
OK
If terminal default is [2] Coast
inverse, it is possible to change
OK
this setting to [0] No function.
No connection to terminal 27 is
then needed for running AMA.
Set desired AMA function.
OK
Enable complete AMA is
recommended.
Set the minimum speed of the
OK
motor shaft.
Set the maximum speed of the
OK
motor shaft.
Set the ramping up time with
reference to synchronous motor
OK
speed, n
.
s
Set the ramping down time
OK
with reference to synchronous
motor speed, n
Set the site from where the
OK
reference must work.
Danfoss A/S © 02/2016 All rights reserved.
OK
.
s
MG33ML02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vlt automationdrive fc 302

Table of Contents