Port Audit Update Test (#36) - Avaya G350 Maintenance Manual

Hide thumbs Also See for G350:
Table of Contents

Advertisement

Port Audit Update Test (#36)

This test sends updates of the CO port translation for all ports on the Media Module which have been
translated. The update is non-disruptive and guards against possible corruption of translation data
contained on the Media Module. No response message is expected from the Media Module once it
receives translation updates. The port translation data includes: ground or loop start trunk, tone or rotary
dialing trunk, rotary dialing inter-digit timing, network balance R/RC, and disconnect timing.
Table 73: TEST #36 Port Audit Update Test
Error
Test
Code
Result
ABORT
2100
ABORT
FAIL
PASS
Maintenance of the Avaya G350 Media Gateway
June 2004
Avaya Communication Manager controlled maintenance
Description/ Recommendation
Could not allocate the necessary system resources to run this test.
Retry the command at 1-minute intervals a maximum of 5 times.
Could not allocate the necessary system resources to run the test.
Internal system error.
Retry the command at 1-minute intervals a maximum of 5 times.
This test passed. Translation information was successfully updated on the
Media Module. User-reported troubles on this port should be investigated
by using other port tests and by examining trunk or external wiring. If the
trunk is busied out, the test does not run, but returns PASS. To verify that
the trunk is in-service:
Enter status-command to verify that the trunk is in-service. If the trunk
is in-service, no further action is necessary. If the trunk is out-of-service,
continue to Step 2.
Enter release-trunk command to put trunk back into in-service.
Retry the test command.
DIOD-TRK (DIOD Trunk)
135

Advertisement

Table of Contents
loading

Table of Contents