System Technician-Demanded Tests: Descriptions And Error Codes; Battery Feed Test (Also Called Port Diagnostic Test) (#35) - Avaya G350 Maintenance Manual

Hide thumbs Also See for G350:
Table of Contents

Advertisement

Avaya Communication Manager controlled maintenance
ALARM-PT (ALARM PORT)
System technician-demanded tests:
Descriptions and Error Codes
CAUTION:
Always investigate tests in the order presented in the table below. By clearing error codes
associated with the Battery Feed Test, for example, you may also clear errors generated
from other tests in the testing sequence.
.
Table 31: System Technician-Demanded Tests
Order of Investigation
Battery Feed Test (#35)
Station Status and Translation Audits and Updates Test
(#36)
*D = Destructive; ND = Nondestructive
Battery Feed Test (also called Port Diagnostic
Test) (#35)
The battery feed chip provides power to the telephone equipment, signaling, rotary dial pulsing,
transmission, and balance. This test checks the signaling and switchhook capabilities of the battery feed
chip by terminating the port, applying battery, and trying to detect a current.
Table 32: TEST #35 Battery Feed Test 1 of 2
Error
Test
Code
Result
ABORT
1000
ABORT
1004
ABORT
74
Description/Recommendation
Could not allocate the necessary system resources to run this test.
Retry the command at 1-minute intervals for a maximum of 5 times.
System resources required to run this test are not available. The port may be
reporting an external device alarm.
Enter test external-device-alarm port GGGVSpp to determine if the
port is reporting an EXT-DEV failure before retesting.
When the port has no EXT-DEV failure, retry the command at 1-minute
intervals for a maximum of 5 times.
The port received an EXT-DEV failure during the test. The test has been
aborted.
Enter test external-device-alarm port GGGVSpp to determine if the
port is reporting an EXT-DEV failure before retesting.
If the port has no EXT-DEV failure, retry the command at 1-minute
intervals for a maximum of 5 times.
Maintenance of the Avaya G350 Media Gateway
Short Test
Long Test
Sequence
Sequence
X
X
X
X
D/ND*
ND
ND
1 of 2
June 2004

Advertisement

Table of Contents
loading

Table of Contents