System Technician-Demanded Tests: Descriptions And Error Codes - Avaya G350 Maintenance Manual

Hide thumbs Also See for G350:
Table of Contents

Advertisement

Avaya Communication Manager controlled maintenance
ISDN-TRK (DS1 ISDN Trunk)
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting errors in the system.
By clearing error codes associated with the NPE Crosstalk Test, for example, you may also clear errors
generated from other tests in the testing sequence.
Table 90: System Technician-Demanded Tests: MG-DS1
Order of Investigation
NPE Crosstalk Test (#6)
Note: This Test ABORTS when run on a
Avaya G350 Media Gateway system.
Conference Circuit Test (#7)
Note: This Test ABORTS when run on a
Avaya G350 Media Gateway system.
Audit and Update Test (#36)
Signaling Link State Check Test (#255)
Service State Audit Test (#256)
Call State Audit Test (#257)
ISDN Test Call Test (#258)
Note: This Test ABORTS when run on a
Avaya G350 Media Gateway system.
D = Destructive, ND = Non-destructive
*
160
Short Test
Long Test
Sequence
Sequence
X
X
X
X
X
X
X
X
X
X
X
Maintenance of the Avaya G350 Media Gateway
D/ND*
ND
ND
ND
ND
ND
ND
ND
June 2004

Advertisement

Table of Contents
loading

Table of Contents