Taylor-Dunn G0-010-00 Service And Replacement Parts Manual page 311

Table of Contents

Advertisement

2. Install brake line banjo bolt. Torque banjo bolt to
specification.
TORQUE
Banjo Bolt:
15 ft-lbs (20 Nm)
3. Install the rear wheel and wheel nuts. Carefully lower
the vehicle.
4. Field test unit for proper braking action before putting
into service. Inspect for fluid leaks and firm brakes.
Make sure the brake is not dragging when pedal is
released. If the brake drags, re-check assembly and
installation.
NOTICE
If new brake pads are installed, brake burnishing is
recommended (see "REAR BRAKE PADS - Brake
Burnishing Procedure").
9929758 R01 - 2019 TAYLOR-DUNN G-100 Service Manual
© Copyright TAYLOR-DUNN
BRAKE SYSTEM
9
9.23

Advertisement

Table of Contents
loading

Table of Contents