Omron Z500 Operation Manual page 143

Profile measuring system
Hide thumbs Also See for Z500:
Table of Contents

Advertisement

The selections will be displayed.
8.
Select Scene.
9.
Select PC to Z500.
10.
Select the data to be loaded.
Select Scn2 in this example.
A confirmation message will be displayed.
11.
Select Execute.
The data will be transferred from the
computer to the Z500.
When the transfer has been completed, the screen in (8.) will return.
During communications, the Z500 will generate a timeout error if there is no response from
CHECK
the external device for more than 110 s. An error message will be displayed on the screen.
SECTION 5
Other Functions
Scn 0
Tools
Test
Scn 0
Surrounding image
Scn 1
Backup
Scene
Z500 to PC
Scn 2
System
PC to Z500
Scn 3
Sys+scn
Scn 4
Slant data
Scn 5
Scn 6
Scn 7
Load data to Scn2.
OK?
Execute
Cancel
Operation Manual
Z500
141

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Z500-mc15eZ500-mc10e

Table of Contents