Eight-Bay Sff Hot-Plug Drive Cage Option - HPE ProLiant ML150 Gen9 User Manual

Table of Contents

Advertisement

One 8 SFF hot-plug drive cage
Install the fans (on page 24).
12.
Install the system air baffle (on page 22).
13.
If removed, install the PCI air baffle
14.
Install the access panel (on page 19).
15.
Return the server to an upright position.
16.
Connect each power cord to the server.
17.
Connect each power cord to the power source.
18.
Power up the server (on page 17).
19.
Install and lock the tower bezel
20.

Eight-bay SFF hot-plug drive cage option

To install the component:
Unlock and remove the tower bezel
1.
Power down the server (on page 17).
2.
Remove all power:
3.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
4.
Remove the access panel (on page 18).
5.
If installed, remove the PCI air baffle (on page 20).
6.
Remove the system air baffle (on page 22).
7.
Remove the fans (on page 23).
8.
Disconnect and remove the drive cage cable assembly:
9.
Disconnect the Mini-SAS cables and the power cable from the system board.
a.
Disconnect the drive cables from the rear of the drives.
b.
("PCI air baffle
option" on page 57).
("Install the tower
bezel" on page 18).
("Remove the tower
bezel" on page 17).
Hardware options installation 76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents