Site Preparation
Thermo Scientific
This chapter describes how to prepare your site before the Thermo Scientific Field Service
Engineer arrives to install the TRACE 1300/TRACE 1310 GC + TRACE 1310 Auxiliary
Oven.
Contents
•
Introduction
•
Workbench & Space Requirements
•
Lighting Requirements
•
Power Requirements
•
LAN Network Requirements
•
Environment Requirements
•
Gas Equipment Requirements
•
Receiving Instruments
•
What Happens Next?
Note In addition to the information in this chapter, you must also obey the building and
safety rules and regulations for construction that apply in your area.
CAUTION For more details about the preparation of the site, refer to the
TRACE 1300/TRACE 1310 Preinstallation Requirements Guide P/N 31715001, Revision C.
TRACE 1310 Auxiliary Oven Instruction Manual