Chapter 3 Components Installation - Thermo Scientific TRACE 1300 Instruction Manual

Auxiliary ovens
Hide thumbs Also See for TRACE 1300:
Table of Contents

Advertisement

Components Installation
Thermo Scientific
This chapter provides instructions for installing and configuring the optional components
such as valves, auxiliary gas modules, auxiliary detectors, secondary oven, methanizer, and
others, in the TRACE 1310 Auxiliary Oven, and the instructions for wiring and coupling the
TRACE 1310 Auxiliary Oven to the TRACE 1300/TRACE 1310 GC.
Contents
Installing the Valves
Installing Valves and Fittings into the Main Oven
Installing Valves and Fittings in the Unheated Compartment
Plumbing Valves and System
Configuring the Valves
Installing the Auxiliary Gas Modules
Installing the Auxiliary Detectors Assembly
Installing the Secondary Oven Assembly
Installing the Methanizer Assembly
Installing a Heated Sample Transfer Line
Wiring the TRACE 1310 Auxiliary Oven to the GC
Coupling the TRACE 1310 Auxiliary Oven to the GC
CAUTION These operations must be carried out by authorized and trained Thermo
Fisher Scientific Service Field Engineers.
TRACE 1310 Auxiliary Oven Instruction Manual
3
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1310

Table of Contents