Components Installation
Thermo Scientific
This chapter provides instructions for installing and configuring the optional components
such as valves, auxiliary gas modules, auxiliary detectors, secondary oven, methanizer, and
others, in the TRACE 1310 Auxiliary Oven, and the instructions for wiring and coupling the
TRACE 1310 Auxiliary Oven to the TRACE 1300/TRACE 1310 GC.
Contents
•
Installing the Valves
•
Installing Valves and Fittings into the Main Oven
•
Installing Valves and Fittings in the Unheated Compartment
•
Plumbing Valves and System
•
Configuring the Valves
•
Installing the Auxiliary Gas Modules
•
Installing the Auxiliary Detectors Assembly
•
Installing the Secondary Oven Assembly
•
Installing the Methanizer Assembly
•
Installing a Heated Sample Transfer Line
•
Wiring the TRACE 1310 Auxiliary Oven to the GC
•
Coupling the TRACE 1310 Auxiliary Oven to the GC
CAUTION These operations must be carried out by authorized and trained Thermo
Fisher Scientific Service Field Engineers.
TRACE 1310 Auxiliary Oven Instruction Manual
3
33