Installation; Unpack And Inspect; Site Preparation - Thermo Scientific ModulyoD Instruction Manual

5l freeze dryer
Table of Contents

Advertisement

3.0

INSTALLATION

WARNING: Use proper lifting technique to lift ModulyoD.
3.1

UNPACK AND INSPECT

Remove all packing and inspect the ModulyoD. If the ModulyoD is damaged, notify
your supplier and the carrier in writing within three days; state the Serial Number of the
ModulyoD together with your order number, and your supplier's invoice number. Retain
all packing materials for inspection. Do not use the ModulyoD if it is damaged.
Check that your package contains the items listed in Table 3, below. If any of these
items are missing, notify your supplier in writing within three days.
Qty
If the ModulyoD is not to be used immediately, replace the protective cover on the
accessory flange. Store the ModulyoD in a clean, dry area until ready for use.
3.2

SITE PREPARATION

The ModulyoD is designed for use on a laboratory benchtop. Locate the ModulyoD in
its required operating position, within convenient access to a suitable electrical supply.
We recommend leaving an air-gap of at least 200 mm (8 in) between all four
sides of the ModulyoD and any wall or obstruction. If you do not leave a sufficient air-
gap, poor cooling of the ModulyoD may result in poor performance. When locating the
ModulyoD, consider ease of access for maintenance and repair work, which may
require removing the cover of the ModulyoD.
Description
1
ModulyoD Freeze Dryer
1
Power cord
1
Power cord for pump
1
Instruction Manual
Table 3 - Checklist of components
Check ✓
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents