Thermo Scientific TRACE 1300 Instruction Manual page 115

Auxiliary ovens
Hide thumbs Also See for TRACE 1300:
Table of Contents

Advertisement

Thermo Scientific
Figure 130. Secondary Oven Installation (3)
5. Connect the ground wire on the bottom of the assembly using the proper fixing screw,
then connect the other end of the wire to the common ground point on the chassis of the
instrument. See
Figure
Figure 131. Methanizer Installation (4)
6. Remount and fix the protective grid. See
Figure 132. Methanizer Installation (5)
7. Connect the cables of the heater element and of the RTD Pt100 probe respectively to the
connectors marked J3 and J9 on the Aux Temp VO/Power Supply board.
See
Figure
133.
131.
Figure
TRACE 1310 Auxiliary Oven Instruction Manual
3
Components Installation
Installing the Methanizer Assembly
132.
Protective Grid
89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1310

Table of Contents