Thermo Scientific TRACE 1300 Instruction Manual page 82

Auxiliary ovens
Hide thumbs Also See for TRACE 1300:
Table of Contents

Advertisement

3
Components Installation
Installing Valves and Fittings in the Unheated Compartment
56
TRACE 1310 Auxiliary Oven Instruction Manual
Figure 79. Unheated Rotary Valve Installation (1)
2. Install the assembly into the unheated compartment under the main oven.
a. Install the bracket into the unheated compartment pay attentions to meet the fixing
slots on the bracket to the three studs located as shown in
Figure 80. Unheated Rotary Valve Installation (2)
Mounting Bracket
Fixing Screws
Valve
Figure
80.
Studs
Slots
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1310

Table of Contents