Thermo Scientific TRACE 1300 Instruction Manual page 69

Auxiliary ovens
Hide thumbs Also See for TRACE 1300:
Table of Contents

Advertisement

Thermo Scientific
CAUTION Be careful to pull the actuator away from the valve standoff by
gripping the standoff but without rotating the actuator or the valve.
Note Handle the valve and standoff with care so the two pieces do not separate.
e. Remove the collar A attached to the valve standoff by loosening the screw that
secures the collar to the valve standoff. This collar mounts to the heater block of the
TRACE 1310 Auxiliary Oven. See
3. Installing the rotary valve and standoff.
a. Locate the desired valve position in the main oven and place the collar A over the
hole in the main oven. See
b. Secure the collar using two M 4 x10 mm screws. Be sure the 7/64" set screw in the
collar is accessible from the outer edge of the TRACE 1310 Auxiliary Oven.
c. Grip the valve standoff by the standoff only, and slide it through the collar allowing it
to extend into the lower valve compartment.
Figure 58. Valve Installation
4. Connecting gas lines from the solenoid valve manifold to the actuator.
Note Gas lines are much easier to connect to the actuator if the connection is made
before the actuator is assembled to the valve.
Installing Valves and Fittings into the Main Oven
Figure
57.
Figure
58.
TRACE 1310 Auxiliary Oven Instruction Manual
3
Components Installation
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1310

Table of Contents