3
Components Installation
Installing Valves and Fittings into the Main Oven
Bulkhead Connectors for High Temperature
38
TRACE 1310 Auxiliary Oven Instruction Manual
Figure 47. Needle Valve and Sample Inlet Fitting Installation (9)
4. Reinstall the plate on the wall of the main oven.
a. Using a cross-head screwdriver screw the four fixing screws of the plate.
See
Figure
48.
Figure 48. Needle Valve and Sample Inlet Fitting Installation (10)
The bulkhead connectors for high temperature (PN 19071022) allows to heat the sample
inlet at high temperature (up to 200 °C) before entering into the main oven.
For installing the sample inlet fittings for high temperature, follow the same procedure
previously described for installing the standard sample inlet fittings. See
valve and the sample inlet fitting into the main oven"
To compare the parts to replace see
Figure 49. Standard Sample Inlet Fitting
on
page
Figure 49
and
Figure
50.
Plate
Extension
Fixing Screws
Sample Inlet Fitting
"To install a needle
34.
Thermo Scientific