Bulkhead Connectors For High Temperature - Thermo Scientific TRACE 1300 Instruction Manual

Auxiliary ovens
Hide thumbs Also See for TRACE 1300:
Table of Contents

Advertisement

3
Components Installation
Installing Valves and Fittings into the Main Oven

Bulkhead Connectors for High Temperature

38
TRACE 1310 Auxiliary Oven Instruction Manual
Figure 47. Needle Valve and Sample Inlet Fitting Installation (9)
4. Reinstall the plate on the wall of the main oven.
a. Using a cross-head screwdriver screw the four fixing screws of the plate.
See
Figure
48.
Figure 48. Needle Valve and Sample Inlet Fitting Installation (10)
The bulkhead connectors for high temperature (PN 19071022) allows to heat the sample
inlet at high temperature (up to 200 °C) before entering into the main oven.
For installing the sample inlet fittings for high temperature, follow the same procedure
previously described for installing the standard sample inlet fittings. See
valve and the sample inlet fitting into the main oven"
To compare the parts to replace see
Figure 49. Standard Sample Inlet Fitting
on
page
Figure 49
and
Figure
50.
Plate
Extension
Fixing Screws
Sample Inlet Fitting
"To install a needle
34.
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1310

Table of Contents