Chapter 1 Triplus Rsh Site Preparation - Thermo Scientific TriPlus RSH Preinstallation Manual

Robotic sample handling
Hide thumbs Also See for TriPlus RSH:
Table of Contents

Advertisement

TriPlus RSH Site Preparation
Thermo Scientific
This chapter gives you the information you need to prepare your site for the installation of the
TriPlus RSH.
Contents
Writing Conventions for TriPlus RSH
Entrance Requirements
Space and Load Requirements
Power Requirements
Environment Requirements
Gas Equipment Requirements
Receiving Instruments
What Happens Next?
CAUTION This guide does not includes the information to prepare your lab for the
installation of your gas chromatographic system. You can find all the instruction in the
Preinstallation Requirements Guide of your GC system.
TriPlus RSH operates reliably under controlled environment conditions. Operating or
maintaining a system outside the specifications outlined in this guide might cause many
different types of system failures. The repair of such failures is specifically excluded from the
standard warranty and service contract coverage.
Note In addition to the information in this guide, you must also obey the building and
safety rules and regulations for construction that apply in your area.
TriPlus RSH Preinstallation Requirements Guide
1
1

Advertisement

Table of Contents
loading

Table of Contents