Thermo Scientific TRACE 1300 Instruction Manual page 90

Auxiliary ovens
Hide thumbs Also See for TRACE 1300:
Table of Contents

Advertisement

3
Components Installation
Installing Valves and Fittings in the Unheated Compartment
64
TRACE 1310 Auxiliary Oven Instruction Manual
• Installing the solenoid valve manifolds
• Connecting gas lines from the solenoid valve manifold to the actuator of the rotary valve
• Connecting gas lines from the solenoid manifold to the valve for liquid sample).
Proceed as follows:
1. Installing the rotary valve on the mounting bracket.
The unheated valve assembly will require the mounting bracket, included as part of the
assembly.
a. Choose the mounting holes in the bracket that will allow the actuator and the valve
to be oriented in a favorable direction.
b. Fix the valve to the bracket by using the two fixing screws. See
Figure 92. Unheated Valve for Liquid Samples Valve Installation (1)
2. Install the valve for liquid samples on the mounting bracket.
a. Choose the mounting holes in the bracket that will allow the valve to be oriented in a
favorable direction.
b. Place the clamp ring over the hole on the bracket, then secure the clamp ring using
the two screws and nuts provided. Loosen one of the two nuts allowing the dowel to
tighten the clamp ring. See
Figure
93.
Figure
92.
Mounting Bracket
Fixing Screws
Rotary Valve
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1310

Table of Contents