Figure 103. Auxiliary Gas Module Installation (3)
4. Using the cable provided connect the 15-pin female BUS connector on the module to the
connector marked J23 on the VOBP-HRM board. See
Figure 104. Auxiliary Gas Module Installation (4)
To install the second auxiliary gas module
1. Undo the screw that fixes the primary module to the floor of the unheated compartment.
See
Figure
105.
Figure 105. Second Auxiliary Gas Module Installation (1)
3
Components Installation
Installing the Auxiliary Gas Modules
Figure
104.