3.10 Wiring Checklist

No.
1
Check drive model number to ensure receipt of correct model.
2
Make sure you have the correct braking resistors, DC reactors, noise filters, and other peripheral devices.
3
Ensure that the area surrounding the drive complies with specifications.
4
The voltage from the power supply should be within the input voltage specification range of the drive.
5
The voltage rating for the motor should match the drive output specifications.
6
Verify that the drive is properly sized to run the motor.
7
Confirm proper branch circuit protection as specified by national and local codes.
8
Properly wire the power supply to drive terminals R/L1, S/L2, and T/L3.
Properly wire the drive and motor together.
9
The motor lines and drive output terminals R/T1, V/T2, and W/T3 should match in order to produce the desired phase order. If the phase order
is incorrect, the drive will rotate in the opposite direction.
10
Use 600 Vac vinyl-sheathed wire for the power supply and motor lines.
Use the correct wire gauges for the main circuit.
• Consider the amount of voltage drop when selecting wire gauges. Increase the wire gauge when the voltage drop is greater than 2% of
motor rated voltage. Ensure the wire gauge is suitable for the terminal block. Use the following formula to calculate the amount of voltage
11
drop:
Line drop voltage (V) = 3 × wire resistance (Ω/km) × wire length (m) × current (A) × 10
• If the cable between the drive and motor exceeds 50 m (164 feet), adjust the carrier frequency set to C6-02 accordingly.
12
Properly ground the drive.
Tightly fasten all terminal screws (control circuit terminals, grounding terminals).
13
Refer to Wire Gauges and Tightening Torque on page
Install a magnetic contactor when using a dynamic braking option. Properly install the resistor and ensure that overload protection shuts off the
14
power supply using the magnetic contactor.
15
Verify phase advancing capacitors, input noise filters, or ground fault circuit interrupters are NOT installed on the output side of the drive.
16
Use twisted-pair line for all drive control circuit wiring.
17
Connect the shields of shielded wiring to the GND
Check for any other wiring mistakes.
18
Only use a multimeter to check wiring.
19
Pick up all wire clippings.
20
Ensure that no frayed wires on the terminal block are touching other terminals or connections.
21
Properly separate control circuit wiring and main circuit wiring.
22
Analog signal line wiring should not exceed 50 m (164 ft.).
23
Safe Disable input wiring should not exceed 30 m (98 ft.).
YASKAWA EUROPE SIEP
Drive, peripherals, option cards
Installation area and physical setup
Power supply voltage, output voltage
Main circuit wiring
Refer to Wire Gauges and Tightening Torque on page
Refer to Ground Wiring on page
53.
50.
Control circuit wiring
terminal.
YASKAWA AC Drive L1000V Technical Manual
Item
50.
-3

3.10 Wiring Checklist

Page
24
206
31
216
217
252
45
45
50
50
53
50
210
-
56
56
-
-
-
-
-
262
61
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents