Terminating And Installing The Connection Module - Siemens ET 200pro Operating Instructions Manual

Small, extremely rugged and high-performance i/o system with ip65/66/67 degree of protection
Hide thumbs Also See for ET 200pro:
Table of Contents

Advertisement

Connection
4.5 Connecting the interface module to a CM IM DP Direct connection module
4.5.6

Terminating and installing the connection module

Terminating and installing the connection module
1. Insert the cover onto the connection module, while pulling back the cables through the
glands.
2. Tighten the two screws on the bottom of the connection module using a crosstip
screwdriver.
3. Tighten the cable strain relief of the M20 cable glands with the open-end wrench (torque
= 3 N/m).
4. Insert the connection module into the interface module.
5. Screw down the connection module to the interface module (torque = 1.5 N/m). Tighten
the four screws evenly, working in cross-wise passes. The screws are already inserted in
the connection module.
86
ET 200pro distributed I/O system
Operating Instructions, 03/2013, A5E00335544-08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents