4.5.5

Connecting the supply voltages

Required Tools
● Screwdriver with 3 mm blade
Requirements
Wiring rules
Connectable conductor cross-sections
of flexible cables
Number of conductors per terminal
Stripped length of the cable insulation
Wire end ferrules to DIN 46228
Connecting the supply voltages
1. Strip the cables to a length of 11 mm, then crimp on the wire end ferrules.
2. Using a 3-mm screwdriver (tightening torque = 0.5 N/m to 0.7 N/m), terminate the supply
See also
Terminating and installing the connection module (Page 86)
ET 200pro distributed I/O system
Operating Instructions, 03/2013, A5E00335544-08
4.5 Connecting the interface module to a CM IM DP Direct connection module
cables on terminal X01, and the daisy-chaining cables on terminal X02 (electronic /
encoder supply 1L+, load voltage supply 2L+).
Figure 4-11
Connecting the supply voltage
Screw terminals for the supply
voltages
Without wire end
0.14 mm to 2.5 mm
ferrule
With wire end ferrule
0.14 mm to 2.5 mm
1 conductor
11 mm
Without insulating
design A, length up to 21 mm
collar
with insulating collar
design E, length up to 12 mm
Connection
2
2
85