Siemens ET 200pro Operating Instructions Manual page 48

Small, extremely rugged and high-performance i/o system with ip65/66/67 degree of protection
Hide thumbs Also See for ET 200pro:
Table of Contents

Advertisement

Mounting
3.2 Rack
Required tools
● Wrench or screwdriver, matching the selected fixing screws.
● Stripping tool and crimp tool for the grounding cable.
Required accessories
Table 3- 1
For...
Outer fixing screws
Grounding cable
Mounting the rack and connecting functional ground (FG)
1. If necessary, mark the mounting holes on the mounting base, then drill holes with a
diameter of 8.5 mm
2. Screw-mount (M8 screws) the rack onto the carrier.
3. Strip the grounding conductor and functional ground (FG) (Cu braid, for example), then
crimp on an M8 ring cable lug.
4. Fasten the grounding conductor using one of the bore holes of the rack: Slip the spring
lock washer, the washer and the cable lug onto the mounting screw, then screw the rack
onto the carrier.
5. Connect the opposite end of the grounding cable to ground potential.
Note
Ensure adequate equipotential bonding.
Figure 3-3
48
Rack and grounding cable
you can use...
M8 cylindrical head screw in accordance
with ISO 1207/ISO 1580
(DIN 84/DIN 85)
M8 hexagonal head screw according to
ISO 4017 (DIN 4017)
Insulated cable, conductor cross-
section: min. 4 mm
mm.
±0.2
Grounding a narrow rack
Description
Select the screw length to match
your setup.
You also need 8.4 mm washers
according to ISO 7092 (DIN 433)
You also need an M8 ring cable lug
and an M8 spring lock washer
2
Operating Instructions, 03/2013, A5E00335544-08
ET 200pro distributed I/O system

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents