Mount The Oit To The Panel - Maple Systems Silver Plus Series Installation And Operation Manual

Hide thumbs Also See for Silver Plus Series:
Table of Contents

Advertisement

14
Clean and deburr the panel cutout before the OIT is installed.

Mount the OIT to the Panel

Ends of screws must not
protrude from the clamp
Screw clamp locking
tabs go through the
slots
1010-1007, Rev 05
Panel
Hold the OIT against
the panel until all screw
clamps are in position
Screw Clamp Placement
In stall ing Screws on the OIT
Position 4 screw clamps
(2 each side)
Sil ver Plus Se ries In stal la tion & Op er a tion Man ual
Tighten all screw clamps until
they are uniformly snug
Panel
Clamps Tightened
Panel

Advertisement

Table of Contents
loading

Table of Contents