Maple Systems Silver Plus Series Installation And Operation Manual page 77

Hide thumbs Also See for Silver Plus Series:
Table of Contents

Advertisement

Using EZware-5000
6. Configure the appropriate COM port settings for your PLC (for more information, see the
Controller Information Sheet for your PLC) and click OK.
7. Adjust Interval of Block pack settings, if necessary. This can be adjusted later by selecting
System Parameters-Settings.
8. Click OK. You are now ready to begin working in EZware-5000 to create your EasyBuilder
project.
To open an existing project
1. On the File Menu, click Open or click the Open icon in the Standard toolbar. The Open
dialog box appears.
2. Click on the project file you intend to open.
3. Click Open. The main screen of EasyBuilder appears with the initial screen of the project
displayed.
To close a project
1. On the File Menu, click Close.
2. If changes have been made to the project file, EasyBuilder will ask you if you would like to
save the project. Then the main screen of EasyBuilder will remain but with no work area
displayed. You must now use the Open or New commands to edit a project.
To save an existing project
1. On the File Menu, click Save or click the Save icon in the Standard toolbar.
2. If the project already has a name, then the project will automatically be saved. If this is a new
project, then the Save As dialog box appears.
3. Enter a file name and then click Save.
4. The main screen of EasyBuilder reappears.
To save a project using the compress feature
The compress feature allows you to save a project in compressed format so that the project data takes less space on
your hard drive. This utility also will save the graphics libraries associated with the project into the project file.
This facilitates sending a copy of the project to another person who has EZware in order to download the project
into an OIT.
73
1010-1007, Rev 05

Advertisement

Table of Contents
loading

Table of Contents