Chapter 4 - Creating Your First Project; Be Fore You Be Gin; Con Nect Ing Oit To Com Puter; Starting Ezware-5000 - Maple Systems Silver Plus Series Installation And Operation Manual

Hide thumbs Also See for Silver Plus Series:
Table of Contents

Advertisement

Cre ating Your First Project

Chapter 4 - Creating Your First Project

Often the best way to learn about new software is to jump right in. This chapter will step you through the process of
installing the EZware-5000 configuration software and then using the software to create a sample project that can be
downloaded to your OIT. We won't go into much detail about how each feature works. The purpose of this
chapter is only to provide you with an overview of the process of creating a functional OIT that can communicate to
a PLC. For our sample project, we will configure the OIT using the local OIT Memory, but you may feel free to
select whichever protocol driver you intend to use.
By the end of this chapter, you should be able to:
• Install EZware-5000 configuration software.
• Create a sample project with two windows and several graphics objects.
• Save a project, compile a project and download the project to the OIT.
• Verify that the OIT is functioning properly.

Be fore You Be gin

Before you install EZware-5000, make sure your computer meets the following minimum system requirements:
• Pentium-based 1.7 GHz or higher processor
• 512 MB of RAM (more memory improves performance)
• 200 MB available hard disk space
• VGA or higher-resolution monitor set for 16 Bit color 1024 x 768 pixel mode
• Microsoft mouse or compatible pointing device
• One available Ethernet port
• Microsoft Windows XP, 2000 or Vista

Con nect ing OIT to Com puter

Before you start your first project, the OIT should be connected to the computer so that the project can be
downloaded after creating it. You should also connect the PLC that you are using to the OIT so that you can test the
operation of the OIT after you have finished creating this sample project.
To connect your OIT to the computer
1. Connect a +24VDC power supply to the OIT.
2. Connect a crossover Ethernet cable between the OIT and PC.
3. Apply power to the OIT.

Starting EZware-5000

Before you can create a sample project, you must start the configuration software. The EZware-5000 software has
two main applications:
• EasyBuilder – used to create the project downloaded to the OIT.
• Project Manager - used to place the OIT into different operating modes.
To start the EZware-5000
1. From the Windows Task Bar, click the Start button, point to Programs, and then click the
Maple Systems-EZware-5000-Project Manager.
2. On the Project Manager dialog box, click EasyBuilder5000.
3. The Welcome to EasyBuilder dialog box appears. Select the correct OIT model.
4. Click OK to display the System Parameters screen of EasyBuilder.
35
1010-1007, Rev 05

Advertisement

Table of Contents
loading

Table of Contents