Tools and Parts Required for Replacing MX2020 Hardware Components

212
Hot-pluggable FRUs—You can remove and replace these components without powering
off the router, but the routing functions of the system are interrupted when the
component is removed.
NOTE:
Before you replace most host subsystem components, such as the
Control Board and Routing Engine (CB-RE), you must take the host
subsystem offline.
You must power off the Control Board and Routing Engine (CB-RE) before
replacing a CompactFlash card or solid-state disk in a Routing Engine.
Table 39 on page 212
lists the FRUs for the MX2020 router.

Table 39: Field-Replaceable Units

Hot-Removable and Hot-Insertable FRUs
PSM air filters
Air filter (lower)
Upper cable manager
Lower cable manager
Craft interface
Switch Fabric Board (SFB) (if redundant)
Backup CB-RE (if redundant)
Master CB-RE (if nonstop active routing is
configured)
Modular Port Concentrators (MPCs)
Adapter cards (ADCs)
Modular Interface Cards (MICs)
AC power supply modules (if redundant)
AC power distribution modules (if redundant)
DC power supply modules (if redundant)
DC power distribution modules (if redundant)
Fan trays
Taking an MX2020 Host Subsystem Offline on page 230
Tools and Parts Required for Replacing MX2020 Hardware Components on page 212
Replacing the MX2020 Craft Interface on page 214
Replacing an MX2020 Fan Tray on page 218
Replacing the MX2020 Air Filters on page 222
To replace hardware components, you need the tools and parts listed in
page
213.
Hot-Pluggable FRUs
Control Board and Routing
Engine (CB-RE) (nonredundant)
Switch Fabric Board (SFB)
(nonredundant)
Table 40 on