Reinstalling the Adapter Card After Installing the MX2020 Router with a Pallet Jack
Copyright © 2013, Juniper Networks, Inc.
Slide the SFB into the chassis until you feel resistance, carefully ensuring that it is
4.
correctly aligned.
Grasp both ejector handles, and gently close them inward simultaneously until the
5.
SFB is fully seated.
Place the ejector handles in their proper position, vertically and toward the center of
6.
the board.
CAUTION:
If one of the SFBs fails, do not remove the failed SFB until you
have a replacement or blank panel to install.
Figure 60: Reinstalling an SFB
0
OK/FAIL
To reinstall an ADC (see
Figure 61 on page
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Take each ADC to be installed out of its electrostatic bag, and identify the slot where
2.
it will be installed.
Locate the slot in the card cage in which you plan to install the ADC.
3.
Chapter 7: Installing the MX2020 Router Using a Pallet Jack
19
106):
105