Preparing The Site For Mx2020 Router Installation; Mx2020 Site Preparation Checklist; Table 26: Mx2020 Site Preparation Checklist - Juniper MX2020 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

CHAPTER 4
Preparing the Site for MX2020 Router
Installation

MX2020 Site Preparation Checklist

Table 26: MX2020 Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors
such as temperature and
humidity do not exceed router
tolerances.
Power
Measure distance between
external power sources and
router installation site.
Locate sites for connection of
system grounding.
Calculate the power
consumption and requirements.
Copyright © 2013, Juniper Networks, Inc.
MX2020 Site Preparation Checklist on page 67
MX2020 Rack Requirements on page 69
Clearance Requirements for Airflow and Hardware Maintenance for the MX2020
Router on page 71
MX2020 Cabinet Requirements on page 72
The checklist in
Table 26 on page 67
preparing a site for router installation.
For More Information
"MX2020 Router Environmental
Specifications" on page 355
"MX2020 DC Power Distribution
Module Description" on page 49
"MX2020 Router Grounding
Specifications" on page 380
"MX2020 AC Power Requirements"
on page 373
"MX2020 DC Power Requirements"
on page 361
summarizes the tasks you must perform when
Performed By
Date
67

Advertisement

Table of Contents
loading

Table of Contents