Juniper MX2020 Hardware Manual page 149

3d universal edge router
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

Copyright © 2013, Juniper Networks, Inc.
Verify that the correct three-phase wye PDMs are installed and secured in the chassis
5.
before connecting power cables.
NOTE:
The power cables must be uninstalled and removed from the
three-phase wye PDM before removal of the PDM from the chassis.
Using a number 2 Phillips (+) screwdriver, unscrew the four captive screws located
6.
on the either side of the metal AC wiring compartment (four screws total on each
PDM).
Remove the metal cover of the metal AC wiring compartment.
7.
Unscrew the retaining nut from the AC power cord.
8.
Place the retaining nut inside the metal wiring compartment.
9.
Put the wires on the AC power cord through the hole of the metal wiring compartment.
10.
Screw the retaining nut onto the AC power cord to secure it to the metal wiring
11.
compartment.
Connect the wires to the AC terminal block on the three-phase wye AC PDM (see
12.
Figure 74 on page
124). Loosen the input terminal or grounding point screw, insert each
wire into the grounding point or input terminal, and tighten the screw.
NOTE:
The terminal connections have either slotted screws or hex screws.
Use a 1/4-in. slotted screwdriver for the slotted screws. Use a 5/32-in.
(4-mm) Allen wrench for the 5/16-in. hex screws.
To connect wires to the terminal block that serves six PSMs:
a. Insert the grounding wire into the grounding point labeled
b. Insert the wire into the input terminal labeled
c. Insert the wire into the input terminal labeled
d. Insert the wire into the input terminal labeled
e. Insert the wire into the input terminal labeled
Chapter 9: Grounding and Providing Power to the MX2020 Router
.
A1
B1
.
.
C1
.
N1
GND
.
123

Advertisement

Table of Contents
loading

Table of Contents