– Unscrew nut -arrow-, remove and expose electric cable.
– Disconnect plug connections -1- and -2-.
For vehicles with manual gearbox
– Remove shift mechanism from gearbox ⇒ Gearbox; Rep. gr.
34 .
– Remove slave cylinder ⇒ Gearbox; Rep. gr. 30 .
For models with automatic gearbox
– Remove selector lever linkage, remove transmission connec‐
tor and remove all mounting brackets from transmission ⇒
Transmission; Rep. gr. 34 .
Continued for all vehicles
– Screw out screws -arrows- on engine mount by approximately
2 turns.
– Screw out screws -arrows- on gearbox mount by approxi‐
mately 2 turns.
Octavia III 2013 ➤ , Octavia III 2014 ➤ , Yeti 2010 ➤ , Yeti 2011 ➤
1.6/81 kW MPI engine - Edition 06.2014
1. Removing and installing engine
15