Checking Sample Program Operation; Opening The Tuning Panel Window - YASKAWA MP210 Series User Manual

Machine controller
Table of Contents

Advertisement

4 System Startup and Sample Programs

4.4.1 Opening the Tuning Panel Window

4.4 Checking Sample Program Operation

This section explains how to check four operations in the model system applying sample programs started in 4.2
or 4.3 by using the Tuning Panel window.
4.4.1 Opening the Tuning Panel Window
(1) From Engineering Manager Window
Use the following procedure to open the Tuning Panel window from the Engineering Manager window.
1. Open the Engineering Manager window, and then select File - Open - Program - Turning Panel from
the menu bar.
Note: 1. For information on how to open the Engineering Manager window of MPE720 Ver 6.,
The Open DWG setting dialog box appears.
2. Enter the number of the drawing (program) to be displayed in the Tuning Panel window in the Name
input field, and then click the OK button.
When using MPE720 Ver 6., the message box shown in step 3 appears and asks for confirmation to
open the Tuning Panel window. (Go to 3.)
When using MPE720 Ver 5., the Tuning Panel window opens.
3. Click the Yes button to open the Tuning Panel window.
4-48
refer to 4.2.2 (1) Setting and Saving Motion Fixed Parameters.
2. For information on how to open the Engineering Manager window of MPE720 Ver 5.,
refer to 4.3.2 (4) Setting and Saving Motion Fixed Parameters.

Advertisement

Table of Contents
loading

Table of Contents