Page 100 of 408
Preparing for installation
Readiness checklist
553-3021-210
Standard 7.00
Have you:
•
read all safety instructions in the first part of this guide?
•
checked to ensure you received all the equipment that was ordered?
•
made sure your area meets all environmental requirements?
•
checked for all power requirements?
•
checked for proper grounding facilities?
•
developed an equipment layout plan for the system?
•
completed the card slot allocation plan?
•
assembled all the tools required to proceed with the installation?
If you have completed all of the above items, you are ready to proceed with
the installation of the system.
January 2002