NTP 112 — Install a G-010V-P ONT
Purpose
This NTP provides the steps to install a G-010V-P ONT.
General
The DLPs listed in this NTP describe mounting and cabling for the G-010V-P ONTs.
Prerequisites
See the listed DLPs for prerequisites.
Recommended tools
You need the following tools for the installation:
#2 Phillips screwdriver
•
1/4 in. (6 mm) flat blade screwdriver
•
•
wire strippers
fiber optic splicing tools
•
RJ-45 cable plug crimp tool
•
voltmeter or multimeter
•
optical power meter
•
•
drill and drill bits
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
3FE 55873 AAAA TCZZA
Edition 01
ONT Product Information Guide
November 2013
NTP 112-1