Activating An Ont Using An Slid; Protocol Trace Window - Alcatel-Lucent 7302 Information Manual

Intelligent services access manager
Table of Contents

Advertisement

6 — ONT management using an ONT interface
2
Select a tracing protocol by choosing either ARP, DHCP, or IGMP.
3
Click Start to initiate a protocol trace.
4
If necessary, click Stop to end a protocol trace.
5
Perform one of the following tasks with the tracing file produced by the protocol
trace.
i
ii
6
STOP. This procedure is complete.
Procedures using CLI interface for Package C ONTs
Not applicable.
Procedures using butt set
Not applicable.
6.14

Activating an ONT using an SLID

The P-OLT is programmed to use the serial number or a SLID to activate a newly
polled ONT on the PON with its provisioning data and services. The serial number
is hard-coded into the ONT; the SLID is a hexadecimal or alphanumeric string that
you enter locally into the ONT to uniquely identify the ONT on the PON.
After the P-OLT polls the PON for new ONTs, the ONT sends its SLID, range, and
registration information to the P-OLT. The P-OLT matches the ONT with its
provisioning data and services in the P-OLT database, using the serial number or the
SLID. When a database match is found, the P-OLT downloads the provisioning data
and services to the ONT, and the ONT and its services are activated.
6-54
November 2013
Figure 6-31 Protocol Trace window
Click Download to save the tracing file.
Click Delete to delete the tracing file.
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
Edition 01
3FE 55873 AAAA TCZZA
ONT Product Information Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

73607330

Table of Contents