Ntp 154-1: I-120G-P Indoor Ont Connections - Alcatel-Lucent 7302 Information Manual

Intelligent services access manager
Table of Contents

Advertisement

4
Place the ONT unit:
a
b
5
Review the connection locations as shown in Figure
indoor ONT.
6
Connect the Ethernet cables to the RJ-45 ports (DLP 101).
7
Connect the POTS cable to the RJ-11 port (DLP 123).
8
Connect the SC/APC fiber optic cable (DLP 125).
9
Install the power supply according to manufacturer specifications.
10
Connect the power cable to the power connector.
11
If used, configure the SLID (DLP 129).
12
Verify the ONT LEDs, voltage status, and optical signal levels (DLP 127).
13
Activate and test the services (DLP 128).
14
If necessary, reset the ONT (DLP 126).
15
STOP. This procedure is complete.
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
3FE 55873 AAAA TCZZA
Edition 01
ONT Product Information Guide
On a flat surface, such as a desk, resting horizontally. Figure
shows the ONT in this position.
On a wall (DLP 122).
Figure NTP 154-1: I-120G-P indoor ONT connections
G E 3
G E 4
Ethernet (GE)
ports RJ-45
POTS
port RJ-11
connector
Warning — Be careful to maintain a bend radius of no less than 1.5
inches (3.8 cm) when connecting the fiber optic cable. Too small of a
bend radius in the cable can result in damage to the optic fiber.
Note — Observe the following:
Units must be powered by a Listed or CE approved and marked
limited power source power supply with a minimum output rate of
12 V dc, 1.25 A.
NTP 154 — Install an I-120G-P indoor ONT
NTP 154-1
P W R
Power
SC/APC
connector
November 2013
NTP 154-1
for the I-120G-P
20705
NTP 154-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

73607330

Table of Contents